Engineering, Procurement and Construction

Our Key Project

  1. 150 kV Substation Line Bay for UGC Bontoala and 60 MVA Bay and Transformer in GI Tanjung Bunga, South Sulawesi , First 150 kV Undeground Cable in South Sulawesi.
  2. 70 kV Transmission Line From Puuwatu – PLTU Nii- Tanaasa , first Transmission Line in Southern Sulawesi .
  3. 150 kV Substation 4 Line Bay for GI Lopana North Sulawesi.
  4. 150 kV Substation and Transmission Line for New Tonasa #5 Cement Plant in Pangkep Region South Sulawesi.
  5. 150 kV Substation 1 Transformer and Bay for GI Pare-Pare South Sulawesi.
  6. 150 kV Substation 1 Coupler Bay for GI Majene West Sulawesi.
  7. 70 kV Substation 2 Line bay for GI Talise Central Sulawesi.
  8. 70 kV Reconductoring Line Pangkep - Mandai South Sulawesi, First Transmission Line using ACCC from CTC (USA) Which carry 2 x Current from normal conductor .
  9. 150 kV Substation 2 Line Bay For GI Sengkang South Sulawesi 1.
  10. 150 kV Substation 2 Line Bay and 1 coupler bay GIS and 1 x 60 MVA Transformer, and finishing commisioning for 1 Bay Transformer bay HIS in GI Bontoala South Sulawesi. This project are milestone of first GIS In South Sulawesi and First Hybrid Switchgear From ABB in South Sulawesi
  11. 150 kV 2 x 25 MVAR Reactor Shunt and bay in Mamuju substation, First Dry Reactor in West Sulawesi.
  12. 150 kV 2 Line bay , 1 trafo Bay , KIMA Substation , Pilot and first Substation tapping form Single Phi Transmission Line #Sungguminasa project in Indonesia
  13. 150 kV 11 Line Bay , Bantaeng Substation , Pilot Project Substation for Smelter in South Sulawesi
  14. 70 kV Reconductoring Transmission Line Pulau Buton – Pulau Muna for 1 , 5 KM Crossing Sea, First succesfull Conducutor ACCC from CTC (USA) Which carry 2 x Current from normal conductor for crossing 1.5 KM Span in Sea . and 50 Meter Height Tower.
  15. 150 kV Erection 2 x 40 MVA Transformer and Bay in Nii-Tanasa substation , for First PLTMG in Kendari Southern Sulawesi.
  16. 275 kV Substation Wotu 2 Diameter, Bay Transformer 90 MVA 275/150 kV , first 275 kV Substation in South Sulawesi.